This equipment is specially developed for universities, research institutes, and industrial and mining enterprises to conduct sintering, reduction, melting, analysis, production, etc. of ceramics, metallurgy, electronics, glass, chemical engineering, machinery, refractory materials, new materials development, special materials, building materials, metals, non-metals and other compound materials under certain pressure. It is controlled by PLC and operated via touch screen.
Device features:Equipment Name | High-temperature and high-pressure stirred shaft furnace laboratory equipment | |
Model Number | RJ-HPG1000-139219TIY10L | |
Power Supply | 3-Phase 380V, 50Hz | |
Temperature Control Accuracy | ±1°C | |
Rated Power | 7KW | |
Temperature Sensor Type | K-Type Thermocouple (φ2×280mm) | |
Max Temperature (Tmax) | 800°C | |
Heating Zone Size | φ250×425mm | |
Reactor Size | Φ219×40, 720mm | |
Furnace Dimensions | 880(L) × 2430(H) × 900(D) mm | |
Recommended Heating Rate | ≤10°C/min | |
Weight | Approx400KG | |
Temperature Precision | ±1°C | |
Pressure Resistance | 300~800°C, Max 8MPa | |
Control system | ![]() |
1. Sintering process curve setting: Dynamically display the setting curve. The equipment can pre-store multiple sintering process curves, and each curve can be freely set. 2. Appointment-based sintering, enabling unmanned operation of the sintering process curve sintering. 3. Real-time display of sintering power, voltage and other information, and recording of sintering data. It can also be exported to achieve paperless recording. 4. Possesses the function of remote control and real-time observation of the equipment status. 5. Temperature correction: The difference between the main control temperature and the sample temperature. Non-linear correction is carried out throughout the sintering process. |
Equipment Details 1 | ![]() |
Electrical contact pressure control gauge |
Equipment Details 2 | ![]() |
Inside the reaction vessel |
Process Control Interface | ![]() |
|
Mechanical Control Interface | ![]() |
|
Equipment Operating Precautions | ★ When the furnace is used for the first time or after being unused for a long time and then being used again, it should be baked at around 300ºC for 2 hours before use. During normal sintering, the furnace temperature must not exceed the rated temperature to avoid damaging the heating elements and the furnace lining. ★ After the furnace chamber has been used for a period of time, small cracks will appear, which is caused by thermal expansion and contraction and is a normal phenomenon. ★ When using a cold furnace, a large amount of heat absorption is required, so the heating rate in the low-temperature section should not be too fast, and the differences in heating rates among the various temperature sections should not be too large. When setting the heating rate, the physical and chemical properties of the sintered material should be fully considered to avoid the phenomenon of material spraying and contamination of the furnace chamber. ★ During operation, if the temperature display value at around 500ºC to 600ºC does not match the program set value or the current fluctuates greatly, please check whether the coefficient settings of "integral I, proportional P, and differential D" are accurate; The adjustment methods of P, I, and D: Specific operations should be referred to the manual. |
|
Service Support | One-year limited warranty, with lifetime support (warranty does not cover consumable parts such as processing tubes and O-rings. Please order replacement parts from the relevant products below). |